The objective is: 
504.329
The running time is: 
304.308
The time meeting best is: 
282.434
Location: 2(load: 29370) 
 Route 0(load: 10820) 30 11 1 2 3 4 5 6 7 8 9 31 10 
 Route 1(load: 9300) 29 28 27 15 26 25 
 Route 2(load: 9250) 13 14 16 24 23 22 21 19 20 18 17 12 0 
The actual cost is 504.329
